PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

2nd floor Detention Cell block work Facing West.jpg Block work around the perimeter of the 2nd Floor Facing South.jpg Chopping concrete slab at the 2nd floor along column line E (South Elevation).jpg East Side of the Building.jpg Installed sprinkler pipes at the 2nd floor Facing North.jpg Laying out block at the 3rd floor detention cells Facing North.jpg Laying out block at the 3rd floor Detention cells Facing West.jpg Sprinkler pipe material.jpg 3rd floor Interior metal framing Facing North-West.jpg
Previous pageNext page Installed sprinkler pipes at the 2nd floor Facing North
Installed sprinkler pipes at the 2nd floor Facing North